Recently, HOT's technical team travelled to Mongolia and successfully completed on-site commissioning of a gold mine tailings filtration system. From equipment coordination and integration to full-system trial runs, every stage reflected the team's professionalism, technical expertise and commitment to quality—providing strong support for the efficient development of this major gold mining project in Mongolia.
As one of Mongolia's key gold mining projects, the mine has approximately 650,000 ounces of gold reserves, with an average ore grade of 3–4 g/t Au, representing significant resource potential and development value.
Since the project began, HOT has consistently upheld high standards and rigorous execution across every stage of delivery. The project was delivered under the EPs model (Engineering + Procurement + Service), covering engineering design and planning, equipment supply and on-site commissioning services.
HOT supplied a comprehensive range of core equipment, including filter presses, conveyor systems, air compressors, pressure vessels, slurry pumps and pump stations, pipelines and valves, as well as MCC/PLC/HMI automation and control systems—ensuring quality and progress throughout the project.

As the Mongolian Gobi was still cool in the early morning, HOT's technical team was already moving among the equipment at the gold processing plant.
From arriving in Ulaanbaatar by air and travelling onward to the project site, to bringing the entire system into stable operation, this cross-border project effort was more than a demonstration of technical capability. It was a commitment to responsibility, quality and delivery.
Let's take a look back at the story behind the commissioning of the Mongolia gold mine tailings filtration system.

Upon arriving at the site, the team was greeted by the vast, open landscape of the surrounding wilderness. Against this backdrop, the blue-green industrial buildings stood out across the site, marking the beginning of the team's on-site commissioning work.

Smooth commissioning relies on thorough preparation and disciplined execution on site.
Upon arrival in Mongolia, the team's first priority was safety training. The principle of "Safety First" was integrated into every stage of work. From equipment operating procedures to emergency response protocols, each item was carefully explained and rehearsed, establishing a solid safety foundation for the commissioning activities that followed.

Commissioning is a critical milestone in project delivery, directly determining whether the system can operate reliably in the long term.
Upon arriving at the site, HOT's technical team quickly got to work, tackling multiple commissioning tasks with professionalism and precision.
01 | MCC and PLC Integration
The team carried out joint commissioning of the MCC and PLC systems, conducting repeated tests and calibrations to ensure accurate coordination between electrical controls and field equipment, establishing a stable and reliable control backbone for the entire system.
02 | Filter Press Commissioning
The filter press underwent no-load operation and loaded testing. Multiple test runs were conducted to verify dewatering performance and ensure that tailings treatment efficiency met the design requirements.
03 | Slurry Pumps, Water Pumps and Piping
The slurry pumps, water pumps and associated pipelines were subjected to comprehensive operational testing. Key parameters such as pressure and flow were carefully checked to ensure smooth and reliable fluid transport.
04 | Conveyor and Air Compressor Systems
The team verified the functionality of the conveyor and air compressor systems, checking equipment start-up and shutdown sequences, operating stability and other details to identify and eliminate potential risks.


During the formal commissioning phase, the team carried out comprehensive testing and optimisation of the project's core equipment and systems.

Located near the Mongolian Gobi, the project site offered the team a unique opportunity to encounter the Gobi bear, often described as a "treasure of the Gobi," during their time off from work.

It was a memorable moment amid an intensive commissioning schedule, adding a special touch to the team's experience in Mongolia.
Through the coordinated efforts of the entire team, the integrated system trial run was successfully completed. All system indicators met expectations, and the system achieved stable and safe operation.
To celebrate the milestone, a customised cake was prepared for the HOT team on site. Team members gathered to share the joy of the successful commissioning and capture memorable moments of this cross-border collaboration.
The cake was more than a celebration of the project milestone—it was a heartfelt recognition of HOT's professionalism, dedication and hard work.


The successful commissioning of the Mongolia gold mine tailings filtration system provides strong support for the efficient development of the client's gold resources and demonstrates HOT's comprehensive capabilities in overseas mining engineering projects.
From equipment supply to on-site commissioning services, HOT has remained focused on client needs, applying its technical expertise across borders and delivering high-quality services directly to the project site.
Looking ahead, HOT will continue to strengthen its capabilities in mining equipment and engineering services, refine its technical expertise, improve on-site service processes and contribute to more overseas projects.
Through professional engineering and reliable delivery, HOT is committed to supporting a greener and more efficient global mining industry.